Shanghai-Kunming Expressway

Released at: 14 March,2019


Xiangtan-Shaoyang Section in Hunan Province
The Xiangtan-Shaoyang section of G60 Shanghai-Kunming Expressway in Hunan Province, 217.968 km long, was finally completed in December 2002. 

 
Huaihua-Xinhuang Section in Hunan Province
The Huaihua-Xinhuang section of G60 Shanghai-Kunming Expressway in Hunan Province, 105.7 km long, was finally completed in November 2007.

 
Shaoyang-Huaihua Section in Hunan Province
The Shaoyang-Huaihua section of G60 Shanghai-Kunming Expressway in Hunan Province, with a main line length of 155.8 km, was finally completed in December 2006. It was granted the 10th China Civil Engineering Zhan Tianyou Award, the 60 Classic Projects Award of Highway Transportation Survey and Design on the 60th Anniversary of China, the National Excellent Engineering Survey Bronze Award, the first prize for Highway Transportation Design Excellence Award, the first prize for Hunan Provincial Excellent Engineering Design Award, Hunan Provincial Quality Engineering Award, and the first prize for Hunan Provincial Science and Technology Progress Award.

 
Liling-Xiangtan Section in Hunan Province
The Liling-Xiangtan section of G60 Shanghai-Kunming Expressway in Hunan Province, with a main line length of 72.391 km, was finally completed in October 2007. Liling-Xiangtan Expressway is the first expressway in Hunan Province which is jointly developed and constructed by multiple entities from inside and outside the province. Its completion plays a positive role in promoting the integrated construction of Changsha, Zhuzhou and Xiangtan.